1999, Jereh was founded and started with import accessories trade. 2000, entered the oilfield industry.
Sun Weijie, Wang Kunxiao and Liu Zhenfeng established “Yantai Jereh Equipment Co., Ltd.” to engage in the trade of imported mining accessories.
Rebuilt a severely damaged RR1500 frac pumper within three months in Qinghai Oilfield and earning Jereh a good reputation in the industry.
We had our first office building, and independently developed our first oilfield equipment, a single-pump reinjection skid, to COSL.
Successfully developed Jereh’s first natural gas compressor unit, a reciprocating compressor for sour gas conditions.
Provided services in offshore platform owned by ConocoPhillips for the first time.
The first compressor unit was delivered.
Developed and released the first cementing truck.
Driven by innovation, Jereh continued to layout in the field of equipment manufacturing and technical services to further develop the upstream and downstream industrial chain, and harvesting international orders.
American Jereh Corporation set up in Houston with factory around 37 acres.
Jereh was listed on the Shenzhen Stock Exchange (SZ002353).
Expanded the upstream business with the acquisition of three large oil blocks(124,000 acres) in Canada.
Launched the new branding logo, and further enriched the image of Jereh as an international, open and innovative enterprise.
Jereh was the first and only oilfield equipment manufacturer in China to provide frac fleet, including E-Frac and Turbine Frac, for U.S. shale gas development.
Continued to lead the development with innovation, and optimized the industrial layout in different fields such as high-end equipment, environmental protection, and industrial collaborative R&D.
Jereh Oil and Gas Engineering Co., Ltd. (Beijing) was established, marking the expansion into oil and gas field surface engineering.
Launched the world's first Apollo 4500hp fracturing equipment, making China the first country to have the equipment.
Built China's first shale gas LNG plant. Pictured: the Wanrui LNG plant in Inner Mongolia, with a daily processing capacity of 81 MMSCFD. This project is also China’s first to integrate BOG-based helium recovery and gas-liquid helium co-production.
Established Jereh Environmental Protection Technology Co., Ltd.(now renamed as Jereh New Energy Regeneration and Recycling Technology Co., Ltd.), focusing on oilfield sludge treatment, sludge dewatering and soil remediation.
Set up UniOrange Design Co., Ltd. to build the world’s first design collaboration cloud platform for industrial products.
Launched the world’s first electric frac solution and innovatively promoted the large-scale exploration of shale gas in complex operating condition.
Maintains a strong development of multiple fields. Through continuous R&D innovation and operation, Jereh earns high-quality development in new energy and other fields.
Released the world's first truck-mounted 6MW gas turbine generator set.
In the same year, Jereh released the world's first 35MW mobile gas turbine generator set, which was successfully delivered to the US.
Established Jereh New Energy Technology Co., Ltd. to develop and produce anode materials for lithium-ion batteries. From groundbreaking to commissioning, the project was completed in just 12 months.
By continuously improving of operational excellence, Jereh will harvest a replicable and inheritable management system that supports its sustainable growth.
Dezhou United Petroleum Technology Corporation (DUPT) successfully completed its initial public offering on the Shenzhen Stock Exchange with the stock code 301158.
To tackle industry challenges, Jereh developed the new generation of lithium-ion battery recycling equipment (with recovery rate and purity reaching dual 98%). It promotes the green and circular development of lithium-ion battery industry.
An agreement has been signed with the Midland Oil Company of Iraq(MdOC) to jointly develop Iraq's second-largest gas field, the Mansuriya Gas Field.
Entering the Jebel Ali Free Zone in Dubai to initiate the construction of a Middle East equipment manufacturing base.
Delivered China’s first FPSO slop treatment unit to Petrobras.
Jereh signed a $920 million EPC contract with ADNOC for AI-powered Well Digitalization Program.
Jereh secured a centrifugal compressor supply contract for the world's first volcanic reservoir gas storage project, DQSP Gas Storage Facility.
At cippe 2025, Jereh unveiled AI·R FRAC Smart Fracturing Solution, an AI-driven, revolutionary system and the world’s first integrated digital solution for intelligent fracturing operation.
Delivered natural gas compressor units for Thailand’s offshore platforms and key livelihood infrastructure projects in Uzbekistan. Won an EPC contract from Sonatrach for a major gas boosting station project in Algeria, with a total value of about USD 850 million.
Secured four gas turbine power generation project orders, each worth over USD 100 million, becoming the first Chinese company to supply complete gas turbine power generation packages to the North American AI industry.